г. Лыткарино, Московская обл., Россия
In located near Moscow Lytkarino have been finished installation and start-up works of the water treatment plant «Crystall-B» with capacity 10 000 m3/day.
The results of laboratory tests have already shown the effectiveness of plant’s operation: treated water fully corresponds to the Sanitary Regulations and Norms and iron content at norm of 0,3µEq/L is only 0,14 µEq/L which is two times lower than the permitted content.
Footage on the TV channel «Lytkari»: