Klin, Russia
At the end of January 2018, the grand opening of the deironing station with a capacity of 8,000 m3/day took place at the water treatment plant No. 1 on Papivina St. in Klin.
This facility was realized by UE «Polymerconstruction» from design to production, installation and commissioning of technological equipment of non-pressure block-modular water treatment plant «Kristall-B». The water treatment plant was opened by Evgeny Khromushin, Minister of Municipal Utilities of the Moscow Region, and Alena Sokolskaya, acting head of the Klin City District Administration.
After the official opening, the quality of treated water was evaluated by all city residents present, and the energy efficiency of the equipment was assessed by representatives of CJSC «Vodokanal».