Verkhnedvinsk, Belarus

Turnkey sewage treatment plants

LLC Promstroycentre

For the object «Verkhnedvinsk sewerage system.» I stage of construction the plant of water treatment equipment «Polymerconstruction» has produced equipment of treatment facilities, which allows to ensure the quality of wastewater treatment in accordance with the required values, complete with automation and dispatching equipment.

The complex of treatment facilities includes:

  • mechanical treatment unit (self-cleaning mechanical grates, vertical sand traps, sand separators);
  • biological reactor (nitri- and denitrification zones);
  • secondary sedimentation unit;
  • dephosphotization unit (reagent dosing station);
  • excess activated sludge treatment unit;
  • disinfection unit;
  • aeration system for nitrification and thickener zones.

On October 31, 2017, the domestic sewage treatment plant with a capacity of 1,250 m3/day was put into operation.