Otradnoye, Moscow Region, Russia
Together with a partner from Moscow region was reconstructed water-intake facility №8 of the settlement Otradnoye, urban district Krasnogorsk. Water treatment equipment manufacturing factory UE “Polymerconstruction” supplied water treatment equipment to increase productivity of the facility to 6 600 m3/day and helped to launch the facility.
Water from artesian wells is treated by means of the non-pressure block-modular plant «Crystall-B», which is characterized with high effectiveness of treatment of complex in composition underground waters and low operating costs. For example, this water treatment station consumes only 12,6 kW*h/day of power and less than 1% of daily capacity of water for filters flushing.
The specialists of the service department of UE “Polymerconstruction” took part in the launch ceremony of water-intake facility №8 along with the representatives of the Ministry of Housing and Utilities of the Moscow region and the head of the city district Krasnogorsk.
Water supplied to the residents corresponds to SanPin norms after reconstruction of the facility.