Opening of the deironing station in the town of Klin

14.02.2018
Opening of the deironing station in the town of Klin

At the end of January 2018, the opening ceremony of the deironing station with the capacity of 8000 m3/day took place at water-intake facility No.1 in Papivin street in Klin.

The project was realized by UP Polymerconstruction from design to manufacture, mounting and commissioning of the technological equipment of the non-pressure block-modular water treatment plant Crystall-B. Minister of Housing and Communal Services of Moscow Region E.A. Khromushin and acting Head of Administration of Klin urban district A.D. Sokolskaya opened the water-intake facility.

After the official opening, the quality of the treated water was evaluated by all the residents of the town and the energy efficiency of the equipment – by the representatives of ZAO Vodokanal.


+
'altasib:feedback.form' is not a component